DFM Review
2D markup, proposed changes
Every project moves through a documented quality process - from drawing review through outgoing inspection.
Each stage produces a written or photographic record that travels with the project file. Available on request.
2D markup, proposed changes
IQC log, material certs
Design approval before steel order
Trial parts, initial dim check
Sample parts, trial video, dim report
Inline log every 30 min during run
Sampling per AQL, critical-dim CMM
Outgoing inspection, load record
Critical dimensions are CMM-measured; coatings and surface finishes verified per project requirement.
Standard documents ship with every order; specialty documents (SGS, third-party test) are arranged on request.
| Document | What it contains |
|---|---|
| Dimension report | Critical features measured on CMM. |
| Material certificate | From the upstream resin or alloy supplier. |
| Mold trial video | 1080p - 30 seconds - captured at T1. |
| SGS report | On request - third-party test for regulated materials. |
| IPQC log | Inline inspection records for the production run. |
| OQC report | Outgoing inspection summary. |